Plumstead Township, Bucks County
- County
- Bucks County
- Citation
- 27-304.98.G (2021)
- Date of data entry
- Aug 22, 2024
- Source document
- View the ordinance (opens in a new tab)
Relevant text
"The solar energy system owner, at his or her expense, shall complete decommissioning of the system within 12 months after the end of the useful life of the system, within 12 months of damage which prevents the system from operating at full-capacity and in a safe manner, and which damage remains continuously unrepaired or uncorrected during the entire said twelve-month period or within 12 months of continuous nongeneration of electricity."