Mahoning Township, Montour County
- County
- Montour County
- Citation
- 250-45.4.B.1.j.2 to 250-45.4.B.1.j.7 (2021)
- Date of data entry
- Not recorded
- Source document
- View the ordinance (opens in a new tab)
Relevant text
"[2] The SEF owner shall then have 18 months in which to dismantle and remove the SEF, including all solar-related equipment or appurtenances related thereto, including, but not limited to, buildings, cabling, electrical components, roads, foundations, solar facility connections and other associated facilities in accordance with agreements with landowners and good industry practice;
[3] To the extent possible, the materials shall be resold or salvaged. Materials that cannot be resold or salvaged shall be disposed of at facility authorized to dispose of such materials by federal or state law;
[4] Any soil exposed during the removal shall be stabilized in accordance with applicable erosion and sediment control standards;
[5] Any access drive paved aprons from public roads shall remain for future use unless directed otherwise by the landowner;
[6] The SEF site area shall be restored to its preexisting condition, suitable for its prior use, except the landowner may authorize, in writing, any buffer landscaping or access roads installed to accommodate the SEF to remain;
[7] Any necessary permits, such as erosion and sedimentation and NPDES permits, shall be obtained prior to decommissioning activities;"