Gratz Borough, Dauphin County
- County
- Dauphin County
- Citation
- 602.56.A (2019) [pg. 130 of linked PDF]
- Date of data entry
- May 23, 2024
- Source document
- View the ordinance (opens in a new tab)
Relevant text
"The applicant shall prepare and submit a narrative and survey map, which includes: (1) an overview of the project; (2) the project location; (3) the approximate generating capacity of the wind farm or solar system; (4) the approximate number, representative types and height or range of heights of wind turbines or solar panels to be constructed, including their generating capacity, dimensions and respective manufacturers; (5) a description of accessory facilities; (6) a listing and map of the properties on which the proposed wind farm or solar system will be located, and the properties adjacent to where the wind farm or solar system will be located; (7) a site plan showing the planned location of each wind turbine or solar panel, lot lines, setback lines, access road and turnout locations, substation, electrical cabling from the wind farm to the substation, ancillary equipment, buildings, and structures, including permanent meteorological towers, associated transmission lines, and layout of all structures within the geographical boundaries of any applicable setback."