Brighton Township, Beaver County
- County
- Beaver County
- Citation
- 195-137.18.D.4 & 195-137.18.D.4.a (2023)
- Date of data entry
- May 31, 2024
- Source document
- View the ordinance (opens in a new tab)
Relevant text
"A land development plan and application shall be filed in accordance with Brighton Township Code, Chapter 180, with site plan information as required. In addition to the information required by the Land Development Code, the following shall be submitted:
(a) A project narrative that includes specific information on the following: an overview of the project, project location, the approximate generating capacity, the number, representative types and heights of facilities to be constructed, including their generating capacity, dimensions, and respective manufacturers, and a description of any ancillary facilities to the PSES. The submission shall include photographs or detailed drawings of the facilities being installed. Applicants shall acknowledge as part of the narrative that approval of the application by Brighton Township does not create in the property owner, the successors and assigns in title or create in the property itself:
[1] The right to remain free of shadows and/or obstructions to solar energy caused by development of adjoining or other property or the growth of any trees or vegetation on such property; or
[2] The right to prohibit the development on or growth of any trees or vegetation on such property."