Alsace Township, Berks County
- County
- Berks County
- Citation
- 643.B (2022) [pg. 89 of linked PDF]
- Date of data entry
- Not recorded
- Source document
- View the ordinance (opens in a new tab)
Relevant text
"A land development plan shall be required to be submitted and reviewed by the Township in accordance with the Township Subdivision and Land Development Ordinance [containing:] 1. A narrative description of the project.
2. A descriptive plot plan including setbacks, property lines, road right-of-ways, dimensions and structural details for all solar arrays, and locations of buildings, access roads, solar arrays, and all electrical lines and off-site connection points.
3. An operations agreement which shall set forth operations parameters, the name and contact information of the certified operator, inspection protocol, emergency procedures, and general safety documentation.
4. Evidence of approval by the electric company or other entity receiving the energy collected from the solar farm that it will accept connection from the solar farm and that it approves of the design plans for the project.
5. An affidavit or evidence of agreement between lot owner and the facility owner or operator, if not the same person or entity, confirming that the facility owner or operator has permission of the property owner to apply for the necessary permits for construction and operation of the solar farm.
6. Evidence of any required permits or licenses from state or federal agencies.
7. A decommissioning plan including provisions for the removal of all structures and foundations and the restoration of soil and vegetation.
8. Any other relevant studies, report, certificates and approvals as may be reasonably requested by Alsace Township based on the unique character of the development."